Write us
Prečítal/a som si zásady ochrany osobných údajov a porozumel/a som im. *
Required field
Form successfuly sent
{common::1::formErrorSent}
Availability
StatusNumber quantityDate of expedition
In stockihneď info
Expedition in same date
Stock in MaterialStock in Material 2-3 days info
Needed manufucturing
To check availability for larger quantities than we currently have in stock nás prosím kontaktujte. For information on quantity and delivery date, nás prosím kontaktujte.
Category
Brands
    Blog
      Products
      No products found

      Load capacity calculation

      The difference between the tested conditions and the real conditions is taken into account by the safety factor. The value of the safety factor can only be determined by a person (designer) who knows the working conditions of the wheels as well as the relevant STN. RENOST consulting can only recommend the value of the factor based on the available information, without guarantee.
      Požadovaná nosnosť sa stanoví nasledovne:
      N=
      V+O
      n
      .β
      Own weight of transport device
      kg
      Maximum load weight
      kg
      Number of scroll wheels and wheels used
      ks
      Safety faktor
      Carrying capacity
      kg
      It determines the deviations of standardized conditions (STN EN 12 527, 12 532) from real ones, which ensure the surface, speed of the device, height of thresholds, slope of slopes, uniformity of load distribution, direction of movement of the roller and wheel, temperature (+15 °C to +28 °C).
      β = 1,3 - 1,5 manual handling in standard conditions, flat cast floor, occasional handling
      β = 1,6 - 3,9 manual handling in adverse conditions - sloping exits, uneven elevator entrances, uneven floors, car exit ramps, frequent handling
      β = 4,0 a viac for machine-towed equipment in continuous operation, generally demanding conditions, not for powered applications

      –⁠
      –⁠
      3649-473_cpb-g100_p~3
      473 CPB-g100 p
      Catalogue code: H770860
      Production 8-14 days
      Production 8-14 days
      12,19 EUR without VAT
      3650-473_cpb-g100_p_as
      Price on demand
      473 CPB-g100 p AS
      Catalogue code: H771334
      Production 8-14 days
      Price on demand
      3651-473_cpb-g100_p_b
      Price on demand
      473 CPB-g100 p B
      Catalogue code: H624057
      Production 8-14 days
      Price on demand
      3652-473_cpb-g100_p~3
      473 CPB-G125 p
      Catalogue code: H720172
      Production 8-14 days
      Production 8-14 days
      14,04 EUR without VAT
      3653-473_cpb-g100_p_as
      Price on demand
      473 CPB-G125 p AS
      Catalogue code: H771335
      Production 8-14 days
      Price on demand
      3654-473_cpb-g100_p_b
      Price on demand
      473 CPB-G125 p B
      Catalogue code: H624058
      Production 8-14 days
      Price on demand
      3655-473_cpb-k100~4
      473 CPB-K080
      Catalogue code: H720190
      In stock in material 20+ ks info
      Needed manufucturing
      In stock in material 20+ ks info
      Needed manufucturing
      9,58 EUR without VAT
      3656-473_cpb-k100_h1
      Price on demand
      473 CPB-K080 H1
      Catalogue code: H624059
      Production 8-14 days
      Price on demand
      3657-473_cpb-k100~4
      473 CPB-K100
      Catalogue code: H720192
      Production 8-14 days
      Production 8-14 days
      10,64 EUR without VAT
      3658-473_cpb-k100_h1
      Price on demand
      473 CPB-K100 H1
      Catalogue code: H624060
      Production 8-14 days
      Price on demand
      3659-473_cpb-k100~4
      473 CPB-K125
      Catalogue code: H720194
      Production 8-14 days
      Production 8-14 days
      11,59 EUR without VAT
      3660-473_cpb-k100_h1
      Price on demand
      473 CPB-K125 H1
      Catalogue code: H624061
      Production 8-14 days
      Price on demand
       
      Loading...
      Load more
      Do you want to write us sth about our products or e-shop? Do not hesitate to write us.
      Message sent

      Basket contains not allowed items

      Basket is empty